A survey and evaluation of static flowshop scheduling heuristics
Data up to Jan 2025
Total Citations Per Year
Abstract
References (17)
Introduction to Sequencing and Scheduling
1977 • 2,655 citations
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
1983 • 2,390 citations
A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
1970 • 859 citations
Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum
1965 • 523 citations
An Evaluation of Flow Shop Sequencing Heuristics
1977 • 506 citations
Statistical Techniques in Simulation
1976 • 360 citations
A “Branch-and-Bound” Algorithm for the Exact Solution of the Three-Machine Scheduling Problem
1965 • 243 citations
A Functional Heuristic Algorithm for the Flowshop Scheduling Problem
1971 • 213 citations
Heuristics for flow-shop scheduling
1980 • 197 citations
Solutions to the Constrained Flowshop Sequencing Problem
1976 • 126 citations
Finding an Optimal Sequence by Dynamic Programming: An Extension to Precedence-Related Tasks
1978 • 125 citations
Four simple heuristics for scheduling a flow-shop
1978 • 98 citations
Operational Research Quarterly
1950 • 96 citations
Flowline group production planning
1968 • 83 citations
A New Bound for Machine Scheduling
1976 • 39 citations
A study of the cutting and burnishing operation during deep hole drilling and its relationship to drill wear
1976 • 22 citations
A new approach for the optimum solution of the M by J production scheduling problem
1976 • 6 citations