A Functional Heuristic Algorithm for the Flowshop Scheduling Problem
Data up to Jan 2025
Published1971
Citations213
References8
Total Citations Per Year
Abstract
References (8)
Optimal two‐ and three‐stage production schedules with setup times included
1954 • 3,158 citations
Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum
1965 • 523 citations
Some Applications of the “Branch-and-Bound” Algorithm to the Machine Scheduling Problem
1966 • 117 citations
Development of M-Stage Decision Rule for Scheduling N Jobs Through M Machines
1964 • 80 citations
An Approach to the Scheduling of Jobs on Machines
1961 • 68 citations
Automatic Data-Processing Systems.
1961 • 47 citations
The Sequencing Problem
1969 • 41 citations
A GENERAL ALGORITHM FOR THEn × MFLOWSHOP SCHEDULING PROBLEM†
1968 • 35 citations