Back to search
Solutions to the Constrained Flowshop Sequencing Problem
Data up to Jan 2025
Published1976
Citations126
References6
Total Citations Per Year
Abstract
References (6)
Optimal two‐ and three‐stage production schedules with setup times included
1954 • 3,158 citations
A “Branch-and-Bound” Algorithm for the Exact Solution of the Three-Machine Scheduling Problem
1965 • 243 citations
A Functional Heuristic Algorithm for the Flowshop Scheduling Problem
1971 • 213 citations
An Approach to the Scheduling of Jobs on Machines
1961 • 68 citations
The Sequencing Problem
1969 • 41 citations
A GENERAL ALGORITHM FOR THEn × MFLOWSHOP SCHEDULING PROBLEM†
1968 • 35 citations
Cited By (0)
Loading...