A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
Data up to Jan 2025
Total Citations Per Year
Abstract
References (11)
Optimal two‐ and three‐stage production schedules with setup times included
1954 • 3,158 citations
Introduction to Sequencing and Scheduling
1977 • 2,655 citations
Theory of scheduling
1967 • 2,160 citations
A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
1970 • 859 citations
Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems
1965 • 591 citations
Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum
1965 • 523 citations
An Evaluation of Flow Shop Sequencing Heuristics
1977 • 506 citations
A “Branch-and-Bound” Algorithm for the Exact Solution of the Three-Machine Scheduling Problem
1965 • 243 citations
A Functional Heuristic Algorithm for the Flowshop Scheduling Problem
1971 • 213 citations
Flowline group production planning
1968 • 83 citations
Development of M-Stage Decision Rule for Scheduling N Jobs Through M Machines
1964 • 80 citations