A Review of Multi‐stage Lot‐sizing Models
Data up to Jan 2025
Total Citations Per Year
Abstract
References (53)
Dynamic Version of the Economic Lot Size Model
2004 • 2,136 citations
Dynamic Version of the Economic Lot Size Model
1958 • 1,969 citations
Decision Systems for Inventory Management and Production Planning
1979 • 1,347 citations
Optimal Policies for a Multi-Echelon Inventory Problem
1960 • 1,193 citations
Games with Incomplete Information Played by ‘Bayesian’ Players, Part III. The Basic Probability Distribution of the Game
1968 • 1,045 citations
A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
1969 • 523 citations
Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
1983 • 394 citations
Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems
1985 • 272 citations
A Deterministic Multi-Period Production Scheduling Model with Backlogging
1966 • 249 citations
Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
1984 • 244 citations
Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems
1969 • 229 citations
Improved Heuristics for Multi-Stage Requirements Planning Systems
1982 • 217 citations
AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING
1977 • 217 citations
Economic Lot Size Determination in Multi-Stage Assembly Systems
1973 • 214 citations
A Comparison of Strategies to Dampen Nervousness in MRP Systems
1986 • 198 citations
HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT*
1980 • 196 citations
An economic lot-sizing technique, I: The part-period algorithm
1968 • 192 citations
Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems
1975 • 191 citations
A Deterministic Multiproduct, Multi-Facility Production and Inventory Model
1966 • 180 citations
A Facilities in Series Inventory Model with Nested Schedules
1972 • 163 citations
An informal survey of multi‐echelon inventory theory
1972 • 154 citations
Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons
1981 • 146 citations
Dynamic Lot Size Models for Multi-Stage Assembly Systems
1973 • 145 citations
Optimal Multi-Level Lot Sizing for Requirements Planning Systems
1980 • 133 citations
Freezing the Master Production Schedule Under Rolling Planning Horizons
1987 • 130 citations
Explaining Observed Productivity Differentials Between Plants: Implications for Operations Research
1985 • 113 citations
MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS
1988 • 111 citations
An Analytic Framework for Evaluating Rolling Schedules
1979 • 108 citations
Single Cycle Continuous Review Policies for Arborescent Production/Inventory Systems
1977 • 84 citations
The impact of a rolling schedule in a multi‐level MRP system
1982 • 83 citations
Lot sizing under dynamic demand conditions: A review
1984 • 80 citations
HEURISTIC LOT‐SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION‐INVENTORY SYSTEM
1979 • 70 citations
A comment on "optimal and system myopic policies for multi-echelon production/inventory assembly systems"
1976 • 64 citations
A Lot-Sizing Algorithm for Reducing Nervousness in MRP Systems
1984 • 58 citations
A NOTE ON DYNAMIC LOT SIZING IN A ROLLING‐HORIZON ENVIRONMENT
1982 • 52 citations
Material Requirement Planning
2019 • 46 citations
A Comparison of Exact and Heuristic Routines for Lot-Size Determination in Multi-Stage Assembly Systems
1972 • 45 citations
Two Modifications Of The Silver-Meal Lot Sizing Heuristic
1984 • 41 citations
Simultaneous lot-sizing and capacity planning in multi-stage assembly processes
1984 • 40 citations
The effect of engineering changes and demand uncertainty on MRP lot sizing: a case study
1985 • 32 citations
Evaluation of lot-sizing techniques
1986 • 31 citations
Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules
1983 • 30 citations
Survey of MRP nervousness issues
1986 • 27 citations
A review of lot-sizing techniques for deterministic time-varying demand
1986 • 24 citations
The part‐period balancing algorithm and its look ahead‐look back feature: A theoretical and experimental analysis of a single stage lot‐sizing procedure
1983 • 15 citations
A re-examination of lot sizing procedures for requirements planning systems: some modified rules
1983 • 12 citations
An experimental study of the efficiency of integer multiple lot sizes in multi-echelon production inventory systems
1985 • 9 citations
Note—A Comment on “Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems
1978 • 9 citations
A report of research on inventory models
1983 • 7 citations
Lot sizing heuristic for multi-echelon assembly systems
1985 • 6 citations
Deterministic lot-sizing procedures for multi-stage assembly systems
1982 • 4 citations
KBLS: A prototype knowledge-based system for the selection of lot-sizing models
1991 • 3 citations
Deleted Work
1955 • 0 citations