Back to search

Total Citations Per Year

Abstract

References (53)

Dynamic Version of the Economic Lot Size Model

2004 • 2,136 citations

Dynamic Version of the Economic Lot Size Model

1958 • 1,969 citations

Decision Systems for Inventory Management and Production Planning

1979 • 1,347 citations

Optimal Policies for a Multi-Echelon Inventory Problem

1960 • 1,193 citations

Games with Incomplete Information Played by ‘Bayesian’ Players, Part III. The Basic Probability Distribution of the Game

1968 • 1,045 citations

A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach

1969 • 523 citations

Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction

1983 • 394 citations

Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems

1985 • 272 citations

A Deterministic Multi-Period Production Scheduling Model with Backlogging

1966 • 249 citations

Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems

1984 • 244 citations

Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems

1969 • 229 citations

Improved Heuristics for Multi-Stage Requirements Planning Systems

1982 • 217 citations

AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING

1977 • 217 citations

Economic Lot Size Determination in Multi-Stage Assembly Systems

1973 • 214 citations

A Comparison of Strategies to Dampen Nervousness in MRP Systems

1986 • 198 citations

HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT*

1980 • 196 citations

An economic lot-sizing technique, I: The part-period algorithm

1968 • 192 citations

Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems

1975 • 191 citations

A Deterministic Multiproduct, Multi-Facility Production and Inventory Model

1966 • 180 citations

A Facilities in Series Inventory Model with Nested Schedules

1972 • 163 citations

An informal survey of multi‐echelon inventory theory

1972 • 154 citations

Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons

1981 • 146 citations

Dynamic Lot Size Models for Multi-Stage Assembly Systems

1973 • 145 citations

Optimal Multi-Level Lot Sizing for Requirements Planning Systems

1980 • 133 citations

Freezing the Master Production Schedule Under Rolling Planning Horizons

1987 • 130 citations

Explaining Observed Productivity Differentials Between Plants: Implications for Operations Research

1985 • 113 citations

MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS

1988 • 111 citations

An Analytic Framework for Evaluating Rolling Schedules

1979 • 108 citations

Single Cycle Continuous Review Policies for Arborescent Production/Inventory Systems

1977 • 84 citations

The impact of a rolling schedule in a multi‐level MRP system

1982 • 83 citations

Lot sizing under dynamic demand conditions: A review

1984 • 80 citations

HEURISTIC LOT‐SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION‐INVENTORY SYSTEM

1979 • 70 citations

A comment on "optimal and system myopic policies for multi-echelon production/inventory assembly systems"

1976 • 64 citations

A Lot-Sizing Algorithm for Reducing Nervousness in MRP Systems

1984 • 58 citations

A NOTE ON DYNAMIC LOT SIZING IN A ROLLING‐HORIZON ENVIRONMENT

1982 • 52 citations

Material Requirement Planning

2019 • 46 citations

A Comparison of Exact and Heuristic Routines for Lot-Size Determination in Multi-Stage Assembly Systems

1972 • 45 citations

Two Modifications Of The Silver-Meal Lot Sizing Heuristic

1984 • 41 citations

Simultaneous lot-sizing and capacity planning in multi-stage assembly processes

1984 • 40 citations

The effect of engineering changes and demand uncertainty on MRP lot sizing: a case study

1985 • 32 citations

Evaluation of lot-sizing techniques

1986 • 31 citations

Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules

1983 • 30 citations

Survey of MRP nervousness issues

1986 • 27 citations

A review of lot-sizing techniques for deterministic time-varying demand

1986 • 24 citations

The part‐period balancing algorithm and its look ahead‐look back feature: A theoretical and experimental analysis of a single stage lot‐sizing procedure

1983 • 15 citations

A re-examination of lot sizing procedures for requirements planning systems: some modified rules

1983 • 12 citations

An experimental study of the efficiency of integer multiple lot sizes in multi-echelon production inventory systems

1985 • 9 citations

Note—A Comment on “Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems

1978 • 9 citations

A report of research on inventory models

1983 • 7 citations

Lot sizing heuristic for multi-echelon assembly systems

1985 • 6 citations

Deterministic lot-sizing procedures for multi-stage assembly systems

1982 • 4 citations

KBLS: A prototype knowledge-based system for the selection of lot-sizing models

1991 • 3 citations

Deleted Work

1955 • 0 citations

Cited By (0)

Loading...