A Comparison of Strategies to Dampen Nervousness in MRP Systems
Data up to Jan 2025
Total Citations Per Year
Abstract
References (11)
Dynamic Version of the Economic Lot Size Model
2004 • 2,136 citations
AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING
1977 • 217 citations
HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT*
1980 • 196 citations
Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach
1979 • 136 citations
Optimal Multi-Level Lot Sizing for Requirements Planning Systems
1980 • 133 citations
THE EFFECTIVENESS OF EXTENDING THE HORIZON IN ROLLING PRODUCTION SCHEDULING
1982 • 89 citations
COST INCREASES DUE TO DEMAND UNCERTAINTY IN MRP LOT SIZING
1983 • 87 citations
The impact of a rolling schedule in a multi‐level MRP system
1982 • 83 citations
HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESS
1983 • 78 citations
A NOTE ON DYNAMIC LOT SIZING IN A ROLLING‐HORIZON ENVIRONMENT
1982 • 52 citations
Simultaneous lot-sizing and capacity planning in multi-stage assembly processes
1984 • 40 citations