Symmetry and optimally properties of the single machine problem
Data up to Jan 2025
Total Citations Per Year
Abstract
References (11)
SCHEDULING A PRODUCTION LINE TO MINIMIZE MAXIMUM TARDINESS
1955 • 619 citations
A dual algorithm for the one-machine scheduling problem
1976 • 272 citations
On Scheduling with Ready Times and Due Dates to Minimize Maximum Lateness
1975 • 233 citations
Sequencing with due‐dates and early start times to minimize maximum tardiness
1974 • 138 citations
Scheduling with earliest start and due date constraints
1971 • 88 citations
An Implicit Enumeration Algorithm for the Machine Sequencing Problem
1971 • 80 citations
On sequencing with earliest starts and due dates with application to computing bounds for the (n/m/G/Fmax) problem
1973 • 72 citations
The One-Machine Sequencing Problem with Early Starts and Due Dates
1972 • 42 citations
Inspection Error and Its Adverse Effects: A Model with Implications for Practitioners
1978 • 19 citations
Heuristic procedures for the single machine problem to minimize maximum lateness
1978 • 19 citations
Symmetry and optimally properties of the single machine problem
1978 • 10 citations