Evaluating Lot‐sizing Performance in Multi‐level MRP Systems: A Comparative Analysis of Multiple Performance Measures
Data up to Jan 2025
Total Citations Per Year
Abstract
References (20)
Production and inventory management
1983 • 1,916 citations
Improved Heuristics for Multi-Stage Requirements Planning Systems
1982 • 217 citations
A Comparison of Strategies to Dampen Nervousness in MRP Systems
1986 • 198 citations
Optimal Lot-Sizing Algorithms for Complex Product Structures
1986 • 175 citations
Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach
1979 • 136 citations
Lot-sizing under uncertainty in a rolling schedule environment
1984 • 115 citations
HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESS
1983 • 78 citations
THE PERFORMANCE OF A SIMPLE INCREMENTAL LOT‐SIZING RULE IN A MULTILEVEL INVENTORY ENVIRONMENT
1985 • 76 citations
Master production scheduling make-to-stock products: a framework for analysis
1990 • 73 citations
Reschedule the reschedules you just rescheduled - Way of life for MRP?
1977 • 71 citations
HEURISTIC LOT‐SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION‐INVENTORY SYSTEM
1979 • 70 citations
Resolving uncertainty in manufacturing systems
1984 • 51 citations
The behavior of lot‐sizing procedures in the presence of forecast errors
1989 • 50 citations
An Improved Heuristic for Multilevel Lot Sizing in Material Requirements Planning
1991 • 42 citations
Open Order Due Date Maintenance in MRP Systems
1989 • 38 citations
Leadtime errors in MRP: the lot-sizing effect
1985 • 36 citations
A comparison of discrete, single stage lot-sizing heuristics with special emphasis on rules based on the marginal cost principle
1982 • 34 citations
Research issues for multi‐level lot sizing in MRP systems
1982 • 34 citations
THE COEFFICIENT OF VARIATION AS A FACTOR IN MRP RESEARCH
1985 • 22 citations
Material Requirements Planning
1978 • 20 citations