Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns

Data up to Jan 2025

Published2006
Citations104
References20

Total Citations Per Year

Abstract

References (20)

Inventory management and production planning and scheduling

1999 • 2,897 citations

Economic Production Cycles with Imperfect Production Processes

1986 • 1,023 citations

Introduction to Operations Research

2000 • 480 citations

Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems

1988 • 425 citations

Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System

1987 • 421 citations

An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes

1991 • 285 citations

Production lot sizing with the reworking of imperfect quality items produced

2001 • 279 citations

Production Lot Sizing with Machine Breakdowns

1992 • 277 citations

Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging

2003 • 221 citations

An optimal production run time with imperfect production processes and allowable shortages

2002 • 151 citations

An optimal production run length in deteriorating production processes

1999 • 144 citations

Optimal preventive maintenance in a production inventory system

1999 • 91 citations

Use of the EOQ model for inventory analysis

1986 • 82 citations

Bounds for production lot sizing with machine breakdowns

1997 • 75 citations

Production-Inventory Systems with Unreliable Machines

1994 • 74 citations

Effects of random defective rate and imperfect rework process on economic production quantity model

2004 • 71 citations

Analysis of a production–inventory system with machine breakdowns and shutdowns

1999 • 55 citations

Approximations to production lot sizing with machine breakdowns

2003 • 37 citations

Do not forget the breakdowns and the maintenance operations in FMS design problems!

1990 • 28 citations

Numerical method for determination of reworking or scraping the defective items in a finite production rate model

2005 • 15 citations