An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints
Data up to Jan 2025
Total Citations Per Year
Abstract
References (10)
Dynamic Version of the Economic Lot Size Model
2004 • 2,136 citations
A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
1969 • 523 citations
Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results
1975 • 195 citations
Bounded Production and Inventory Models with Piecewise Concave Costs
1973 • 193 citations
Extensions of the Planning Horizon Theorem in the Dynamic Lot Size Model
1969 • 114 citations
Some Generalizations of an Inventory Planning Horizon Theorem
1964 • 111 citations
A Deterministic Multi-Period Production Planning Model with Piecewise Concave Production and Holding-Backorder Costs
1975 • 85 citations
Planning Horizons for Production Smoothing with Deterministic Demands
1973 • 65 citations
A Class of Deterministic Production Planning Problems
1973 • 47 citations
Production Smoothing Under Piecewise Concave Costs, Capacity Constraints and Nondecreasing Requirements
1977 • 11 citations