Back to search
Scheduling coupled tasks
Data up to Jan 2025
Published1980
Citations70
References9
Total Citations Per Year
Abstract
References (9)
Reducibility among Combinatorial Problems
1972 • 10,743 citations
The Complexity of Flowshop and Jobshop Scheduling
1976 • 2,465 citations
Theory of scheduling
1967 • 2,160 citations
Computer and job-shop scheduling theory
1976 • 1,124 citations
On the Computational Complexity of Combinatorial Problems
1975 • 683 citations
On the Flow-Shop Sequencing Problem with No Wait in Process†
1972 • 241 citations
Machine Scheduling Problems
1976 • 120 citations
Radar signal design subject to simultaneous peak and average power constraints
1966 • 32 citations
Optimal allocation of tracking pulses for an array radar
1970 • 6 citations
Cited By (0)
Loading...