Back to search

A Lower Bounding Structure for Lot-Size Scheduling Problems

Data up to Jan 2025

Published1975
Citations44
References26

Total Citations Per Year

Abstract

References (26)

Dynamic Version of the Economic Lot Size Model

2004 • 2,136 citations

The Traveling-Salesman Problem and Minimum Spanning Trees

1970 • 1,431 citations

Convexity and Optimization in Finite Dimensions I

1970 • 885 citations

Nonlinear and Dynamic Programming

1966 • 751 citations

A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach

1969 • 523 citations

Programming of Economic Lot Sizes

1958 • 392 citations

Duality in Nonlinear Programming: A Simplified Applications-Oriented Development

1971 • 319 citations

A Dynamic Programming Approach to a Lot Size Scheduling Problem

1966 • 303 citations

An Efficient Algorithm for Multi-Item Scheduling

1971 • 268 citations

Solving the Fixed Charge Problem by Ranking the Extreme Points

1968 • 234 citations

A Linear Programming Approach to Production and Employment Scheduling

1960 • 227 citations

Optimal Programming of Lot Sizes, Inventory and Labor Allocations

1965 • 198 citations

Parametric Production Planning

1967 • 140 citations

Using duality to solve discrete optimization problems: Theory and computational experience

1975 • 122 citations

The fixed charge problem

1970 • 116 citations

Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources

1975 • 107 citations

Multi-Item Production Planning—An Extension of the HMMS Rules

1970 • 88 citations

A postscript to “Dynamic problems in the theory of the firm”

1960 • 82 citations

An approximate solution method for the fixed charge problem

1967 • 78 citations

Constructive Duality in Integer Programming

1974 • 74 citations

Simulation Tests of Lot Size Programming

1963 • 72 citations

Dynamic problems in the theory of the firm

1958 • 58 citations

An approximative algorithm for the fixed charge problem

1969 • 48 citations

Multi-Item Lot Size Scheduling by Heuristic Part II: With Variable Resources

1975 • 47 citations

Planning Tire Production

1970 • 41 citations

An Operational System for Smoothing Batch-Type Production

1966 • 15 citations

Cited By (0)

Loading...