Back to search

Total Citations Per Year

Abstract

References (24)

Information Distortion in a Supply Chain: The Bullwhip Effect

1997 • 4,539 citations

The Value of Information Sharing in a Two-Level Supply Chain

2000 • 2,097 citations

Supply Chain Inventory Management and the Value of Shared Information

2000 • 1,801 citations

Process Capability Indices.

1995 • 1,060 citations

Quality Engineering in Production Systems

1990 • 934 citations

Value of Information in Capacitated Supply Chains

1999 • 915 citations

Automatic Tuning of Pid Controllers

1988 • 897 citations

Statistical Control: By Monitoring and Feedback Adjustment

1997 • 392 citations

Statistical Control by Monitoring and Feedback Adjustment

1998 • 322 citations

Maximum matching in a convex bipartite graph

1967 • 167 citations

Determining the Most Profitable Target Value for a Production Process

1977 • 167 citations

Determination of the Best Mean Contents for aCanning Problem

1987 • 130 citations

Joint Monitoring of PID-Controlled Processes

1999 • 72 citations

Statistical monitoring and diagnosis of automatic controlled processes using dynamic PCA

2000 • 67 citations

Integrated design of run-to-run PID controller and SPC monitoring for process disturbance rejection

1999 • 59 citations

Best Target Value for a Production Process

1978 • 54 citations

On the Efficiency and Robustness of Discrete Proportional-Integral Control Schemes

1998 • 51 citations

Integrated design of run-to-run PID controller and SPC monitoring for process disturbance rejection

1999 • 34 citations

Optimal machine settings of imperfect component production processes for assembly operations

1990 • 18 citations

Improving automatic‐controlled process quality using adaptive principal component monitoring

1999 • 13 citations

A framework of distributed quality control

1998 • 10 citations

Dynamic control of imperfect component production for assembly operations

1995 • 8 citations

The Box-Jenkins bounded manual adjustment chart: A graphical tool designed for use on the

1998 • 7 citations

Improving automatic‐controlled process quality using adaptive principal component monitoring

1999 • 4 citations

Cited By (0)

Loading...