Alternate Routing Strategies in Batch Manufacturing: An Evaluation
Data up to Jan 2025
Total Citations Per Year
Abstract
References (17)
Introduction to simulation and SLAM II
1979 • 1,258 citations
A state-of-the-art survey of dispatching rules for manufacturing job shop operations
1982 • 991 citations
CAD/CAM: Computer-Aided Design and Manufacturing
1983 • 291 citations
Production-Inventory Systems: Planning and Control
1969 • 282 citations
Grouping Observations in Digital Simulation
1978 • 178 citations
An Economic Evaluation of Job Shop Dispatching Rules
1973 • 105 citations
A Methodology for Assigning Minimum Cost Due-Dates
1977 • 103 citations
A Simulation of Labor Efficiency and Centralized Assignment in a Production Model
1970 • 64 citations
Effects of Shop Size and Labor Flexibility in Labor and Machine Limited Production Systems
1975 • 45 citations
Priority Scheduling and Inventory Control in Job Lot Manufacturing Systems
1972 • 26 citations
Work Flow Structure: An Analysis for Planning and Control
1970 • 21 citations
Job shop control
1981 • 20 citations
A machine loading procedure which considers part complexity and machine capability
1979 • 11 citations
Critical Ratio Scheduling with Queue Waiting Time Information: An Experimental Analysis
1976 • 11 citations
Robotics for smaller manufacturers: Myths and realities
1986 • 7 citations
An investigation of alternate routing in the job shop as a planning process
1985 • 4 citations
Deleted Work
1955 • 0 citations