Production and delivery scheduling problem with time windows
Data up to Jan 2025
Total Citations Per Year
Abstract
References (16)
Tabu Search
1997 • 5,915 citations
Tabu Search—Part II
1990 • 5,665 citations
A user's guide to tabu search
1993 • 902 citations
A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
1996 • 834 citations
Scheduling jobs with fixed start and end times
1987 • 301 citations
Hybrid flow-shop scheduling problems with multiprocessor task systems
2003 • 105 citations
A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities
2003 • 95 citations
Minimal Resources for Fixed and Variable Job Schedules
1978 • 95 citations
Heuristic algorithms for the two-stage hybrid flowshop problem
1997 • 92 citations
Exact and approximation algorithms for the operational fixed interval scheduling problem
1995 • 74 citations
Scheduling jobs within time windows on identical parallel machines: New model and algorithms
1995 • 52 citations
Hybrid Information Systems
2002 • 48 citations
Performance of scheduling algorithms for no-wait flowshops with parallel machines
1993 • 39 citations
Artificial intelligence search methods for multi-machine two-stage scheduling with due date penalty, inventory, and machining costs
2001 • 21 citations
A Comparison of GRASP and an Exact Method for Solving a Production and Delivery Scheduling Problem
2002 • 10 citations
Deleted Work
1955 • 0 citations