Back to search
Hierarchical approach to project planning: The case of a petroleum pipeline construction
Data up to Jan 2025
Published1996
Citations17
References8
Total Citations Per Year
Abstract
References (8)
Critical-Path Planning and Scheduling: Mathematical Basis
1961 • 888 citations
A Network Flow Computation for Project Cost Curves
1961 • 373 citations
Planning for project control through risk analysis: a petroleum pipeline-laying project
1994 • 121 citations
Dynamic Programming for Project Cost-Time Curves
1967 • 44 citations
A goal programming model for project crashing with piecewise linear time-cost trade-off
1986 • 37 citations
The application of goal programming techniques to the CPM problem
1978 • 24 citations
Optimization of time and cost
1985 • 12 citations
The use of integer linear programming for modelling project control information
1985 • 8 citations
Cited By (0)
Loading...