Back to search
Automated Two-machine Flowshop Scheduling: A Solvable Case
Data up to Jan 2025
Published1991
Citations83
References5
Total Citations Per Year
Abstract
References (5)
Optimal two‐ and three‐stage production schedules with setup times included
1954 • 3,158 citations
Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
1964 • 551 citations
Introduction to manufacturing processes
1999 • 350 citations
Flowshop scheduling with limited temporary storage
1980 • 248 citations
On the Flow-Shop Sequencing Problem with No Wait in Process†
1972 • 241 citations
Cited By (0)
Loading...