A General Bounding Scheme for the Permutation Flow-Shop Problem
Data up to Jan 2025
Total Citations Per Year
Abstract
References (22)
Optimal two‐ and three‐stage production schedules with setup times included
1954 • 3,158 citations
The Complexity of Flowshop and Jobshop Scheduling
1976 • 2,465 citations
Theory of scheduling
1967 • 2,160 citations
Complexity of Machine Scheduling Problems
1977 • 2,115 citations
A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
1970 • 859 citations
SCHEDULING A PRODUCTION LINE TO MINIMIZE MAXIMUM TARDINESS
1955 • 619 citations
Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems
1965 • 591 citations
Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum
1965 • 523 citations
Machine Scheduling Problems: Classification, complexity and computations
1976 • 488 citations
A “Branch-and-Bound” Algorithm for the Exact Solution of the Three-Machine Scheduling Problem
1965 • 243 citations
Job-Shop Scheduling by Implicit Enumeration
1977 • 181 citations
Sequencing by enumerative methods
1977 • 166 citations
Flow-Shop Scheduling with the Branch-and-Bound Method
1967 • 150 citations
Some Applications of the “Branch-and-Bound” Algorithm to the Machine Scheduling Problem
1966 • 117 citations
Minimizing maximum lateness on one machine: computational experience and some applications
1976 • 115 citations
A Comparative Study of Flow-Shop Algorithms
1975 • 87 citations
A General Algorithm for Solution of the n-Job, M-Machine Sequencing Problem of the Flow Shop
1967 • 79 citations
Optimal Elimination Methods in the m × n Flow-Shop Scheduling Problem
1973 • 53 citations
Elimination methods in them ×n sequencing problem
1971 • 49 citations
A New Bound for Machine Scheduling
1976 • 39 citations
A Branch-and-Bound Algorithm for Flow Shop Scheduling Problems
1970 • 36 citations
ON THE BOUND OF MAKESPANS AND ITS APPLICATION IN M MACHINE SCHEDULING PROBLEM
1967 • 18 citations