Back to search
Optimum Production Scheduling of Multicommodity in Flow Line
Data up to Jan 2025
Published1972
Citations28
References10
Total Citations Per Year
Abstract
References (10)
Optimal two‐ and three‐stage production schedules with setup times included
1954 • 3,158 citations
Branch-and-Bound Methods: A Survey
1966 • 1,915 citations
One-Machine Sequencing to Minimize Certain Functions of Job Tardiness
1969 • 343 citations
Minimum Change-Over Scheduling of Several Products on One Machine
1968 • 64 citations
Multilevel systems and concepts in process control
1970 • 64 citations
Systems Engineering in the Glass Industry
1969 • 24 citations
Smoothing Start-Up and Shut-Down Costs in Sequential Production
1969 • 17 citations
Optimum schedule control of conveyer line
1969 • 16 citations
A Loading Problem in Process Type Production
1968 • 7 citations
Systems Engineering intheGlass Industry
1969 • 2 citations
Cited By (0)
Loading...