Part Dispatch in Random Yield Multistage Flexible Test Systems for Printed Circuit Boards
Data up to Jan 2025
Total Citations Per Year
Abstract
References (17)
Production and inventory management
1983 • 1,916 citations
Dynamic Programming and Stochastic Control
1977 • 1,263 citations
Lot Sizing with Random Yields: A Review
1995 • 954 citations
Planning Production, Inventories, and Work Force.
1962 • 930 citations
Optimal control of production rate in a failure prone manufacturing system
1986 • 653 citations
Multiproduct Queueing Networks with Deterministic Routing: Decomposition Approach and the Notion of Interference
1988 • 218 citations
Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems
1982 • 196 citations
Technical Note—Allocation of Effort Resources among Competing Activities
1975 • 189 citations
Periodic Review Production Models With Variable Yield And Uncertain Demand∗
1988 • 176 citations
Short-term production scheduling of an automated manufacturing facility
1985 • 173 citations
Simple Ranking Methods for Allocation of One Resource
1980 • 171 citations
Production Control in Multistage Systems with Variable Yield Losses
1988 • 151 citations
Performance of Hierarchical Production Scheduling Policy
1984 • 143 citations
Production control
1959 • 57 citations
Optimal Production Smoothing and Safety Inventory
1974 • 22 citations
Smoothing Production by Inventory—An Application of the Wiener Filtering Theory
1971 • 14 citations
Efficient computation of coordinating controls in hierarchical structures for failure-prone multicell flexible assembly systems
1990 • 14 citations